City of Onkaparinga
Construction of Sturt River Bridges
Details
Description
The construction of the Winns and Main Road Bridges across the Sturt River in Coromandel Valley is a joint initiative between the City of Onkaparinga and the City of Mitcham.
The contract will be executed by the Principal, City of Onkaparinga on behalf of the representative, the City of Mitcham.
The principal representative from the City of Mitcham is John Raymond, in his absence David Deer will act as proxy.
An engineering Principal Consultant will represent both the City of Onkaparinga and the City of Mitcham, providing
- Attendance and sign off at hold points nominated throughout the project
- Provision of design clarification which was not anticipated as a part of the previous design phase
- Provision of a statement which demonstrates how GHD has considered safety in the design of the bridges during the construction phase.
TenderHub gathers information continuously from a variety of sources. There may be delays between information being updated at the source and presented here. Always check with the source if you are concerned about currency or accuracy.
Key details
- Buyer
- City of Onkaparinga
- Source
- SA Tenders and Contracts
Briefings & site visits
No briefings or site visits were listed for this tender.
See who else bid on this tender
Subscribers see every supplier who bid on this tender, plus its change history and a direct link to the source notice.