Back
Corangamite Catchment Management Authority
Lower Barwon River Wetlands Channel Desilting - Contract No. 1820
AwardedRequest for Tender
Details
Awarded
Description
Desilting existing inlet and outlet channels of Reedy Lake and Hospital Swamps that form part of the Lower Barwon River Wetlands.
The scope of works to be executed consists of:
- Site preparation including access arrangements for construction plant and equipment
- Desilting of the inlet and outlet channels to Reedy Lake
- Desilting of the inlet and outlet channels to Hospital Swamp
- Desilting, trimming of channels and cleanup of vegetation around culverts, regulators and fishways located on the channels
- Trimming of spoil heaps resulting from the desilting work
- Maintenance for 12 months as specified.
TenderHub gathers information continuously from a variety of sources. There may be delays between information being updated at the source and presented here. Always check with the source if you are concerned about currency or accuracy.
Key details
- Source
- Buying for Victoria
Briefings & site visits
No briefings or site visits were listed for this tender.
Awarded suppliers
1Contract awarded
$93,000 awarded to 1 supplier
See who else bid on this tender
Subscribers see every supplier who bid on this tender, plus its change history and a direct link to the source notice.