Armadale Line – Stokely Over Canning – Level 2 Inspection, Paint Assessment, Walkway Review and Cost Estimate
AwardedSelect Tender
Details
Awarded
Select tender
This is a select tender. Details and access to the source may be limited to invited suppliers only.
Description
The Public Transport Authority (PTA) is seeking the services of a suitably qualified and experienced consultant to undertake the following Scope of Services on the Stokely Over Canning Rail Bridge: Review, validate and certify the walkway design and documentation, including Load Rating assessment result.Conduct Level 2 engineering inspection and record the defects.Carry out a steel protection coating investigation to assess and identify a painting maintenance strategy.Provide a cost estimation for the bridge remediation work. The estimation shall include the work methodology required.Provide a cost estimation Walkway supply and installation works. The Stokely Over Canning Rail Bridge (PTA Ellipse Equipment Refer: A018.057/SC/RAB) at Gosnells is a rail crossing bridge over Canning River located on the Armadale Rail Line at 18.057km chainage. This bridge, constructed in 1987, has a superstructure consisting of 5 simply supported spans comprising four main steel I-girders with a total length of 91.5m. The total width of the existing bridge is 8.8m overall. No edge protection is provided along the existing bridge. However, there are five refuges attached to the Down Main side of the bridge, and five refuges are attached to the Up Main side of the bridge for emergency situations. The refuges are planned to be replaced by the walkway on both side of the bridge. In 2017, PTA engaged a consultant to develop the design of the steel walkway on both sides of the existing bridge to replace the existing refuges. The load capacity of the rail bridge has been assessed, and the superstructure of the bridge has been rated with a minimum of 110% of 200LA with proposed walkway dead loads. In 2021 and 2022, PTA engaged a consultant to load rate all the rail bridges along the Armadale line, including this rail bridge. The assessment included the considerations of the PTA-registered rail vehicles on the networks, including 200LA rail design load, rollingstock, EMU and track machines. The strengthening work of the existing pier has been identified and is currently under design development. Currently, there is no historical record available about the existing protective coating work of the bridge.
TenderHub gathers information continuously from a variety of sources. There may be delays between information being updated at the source and presented here. Always check with the source if you are concerned about currency or accuracy.
Key details
- Source
- Tenders WA
Briefings & site visits
No briefings or site visits were listed for this tender.
Awarded suppliers
1Contract awarded
$159,640 awarded to 1 supplier
$159,640
Mia Yellagonga Tower 2, Level 5, 5 Spring Street, Perth WA Australia 6000
View supplier insights
See who else bid on this tender
Subscribers see every supplier who bid on this tender, plus its change history and a direct link to the source notice.