Back

Subsea 7 Australia Contracting Pty Ltd

BAROSSA PROJECT - TRANSPORTATION AND INSTALLATION OF SUBSEA UMBILICALS RISERS AND FLOWLINES (SURF) - BAR-020 Riser Tether Bases

AwardedWork Package

Details

Awarded

Description

See attached scope of work and zip files for additional information.
Overview

About Subsea 7

Subsea 7 is a global leader in delivering offshore projects and services for the evolving energy industry. The company creates sustainable value by being the industry's partner and employer of choice to deliver the efficient offshore solutions the world needs. Project management, engineering and construction expertise are provided across the full field lifecycle. These services are delivered to clients in the Oil & Gas and Renewables sectors.

About the project

Barossa is an offshore gas and light condensate project being progressed by the Barossa Joint Venture comprising Santos NA Barossa Pty Ltd (Santos) as Operator, Santos Offshore Pty Ltd and SK E&S Australia Pty Ltd.

As part of the Barossa Offshore Project, Santos has selected Subsea 7 to provide the Transportation and Installation of Subsea Umbilicals Risers and Flowlines (SURF).

Subsea 7's scope of work includes the following:

  • Project management and engineering to complete the following works;
  • Procurement of 14" and 6" line pipe and bends for flowlines, Flowline End Terminations (FLETs) and tie-in spools;
  • Coating of 14" and 6" line pipe and bends for flowlines, FLETs and tie-in spools;
  • Design and procurement of concrete mattresses and scour mitigation systems;
  • Design, fabrication, transportation and installation of FLETs, Displacement Initiators (DIs) and Riser Tether Bases (RTBs);
  • Fabrication at onshore spool base, transportation and reel-lay installation of flowlines;
  • Fabrication, transportation and installation of export spools, tie-in spools and well jumpers;
  • Transportation and installation of all Client Provided Items (CPI) - manifolds, risers, umbilicals, flexible jumpers and flying leads;
  • Pre-commissioning of subsea system.

Procurement and subcontracting

Subsea 7 shall execute the project by sourcing the best commercial and technically delivered solution to satisfy the company's business needs without compromising safety, quality or the environment.

Subsea 7 is committed to supporting Santos' Barossa Australian Industry Participation (AIP) Plan to ensure all suppliers are given a Full, Fair, and Reasonable Opportunity to participate in the development of the Barossa Project. Throughout the project, Subsea 7 will comply with all the requirements as stated in the Barossa AIP Plan and the Australian Jobs Act 2013.

Pre-Qualification Process

All Suppliers must undergo a pre-qualification process. Depending on the nature and complexity of the supply, the pre-qualification process may involve an assessment of a Supplier's financial standing, technical capability, Quality, Health, Safety, and environmental track record.

From mid-2021 onwards, all pre-qualifications will be conducted online via SAP Ariba. Subsequent to initial screenings, potential suppliers will be invited to complete a Supplier Pre-Qualification Questionnaire.

Please be advised that when submitting an EOI, all potential suppliers must provide a completed "Initial Screening Questionnaire" for EACH work package. This will assist Subsea 7 in more efficiently identifying suitable potential suppliers before proceeding with pre-qualification.

Subsea 7 Code of Conduct for Suppliers

Subsea 7 is committed to operating honestly and with integrity and to complying with all applicable laws in all jurisdictions in which it operates. Subsea 7 requires all Suppliers to do the same. Expectations are outlined in the "Our Code of Conduct for Suppliers," which can be found in the Project Documents section.

Contact details

Further details on the Project and associated opportunities can be found at BarossaOffshore.icn.org.au

Locations

Request type

Work Package

TenderHub gathers information continuously from a variety of sources. There may be delays between information being updated at the source and presented here. Always check with the source if you are concerned about currency or accuracy.

Key details

Source
Gateway by ICN

Briefings & site visits

No briefings or site visits were listed for this tender.

Awarded suppliers

1

Contract awarded

1 supplier has won this tender

  • PT Singatac Bintan

    $0

    Lot 2, Bintan Industrial, Lobam, Bintan,Kepulauan Riau, Contact: Desmond Chew

See who else bid on this tender

Subscribers see every supplier who bid on this tender, plus its change history and a direct link to the source notice.