Back

Main Roads WA

Refurbishments and Maintenance Works to Bridge No 0371 on Forrest Rd Over Wungong River

AwardedRequest for Tender

Details

Awarded

Description

The contract allows for specific maintenance to Bridge 0371, the extent of work is as follows:
• Abutment Pile Repairs
• Stringer replacements
• Corbel replacements
• Abutment halfcap replacement
• Corrosion treatment of Bracing
• Guardrail works
• Expansion joint and deck remediation’s
• Permanent excavation to increase headroom for future inspections

Request type

Request for Tender

TenderHub gathers information continuously from a variety of sources. There may be delays between information being updated at the source and presented here. Always check with the source if you are concerned about currency or accuracy.

Key details

Source
Tenders WA

Briefings & site visits

No briefings or site visits were listed for this tender.

Awarded suppliers

1

Contract awarded

$226,875 awarded to 1 supplier

  • Jomar Contracting (MAINFORM CORPORATION PTY LTD)

    $226,875

    115 Queens Road, SOUTH GUILDFORD WA Australia 6055

See who else bid on this tender

Subscribers see every supplier who bid on this tender, plus its change history and a direct link to the source notice.