North East Water
Wodonga - Middle Creek & Baranduda SPS Upgrades
Details
Description
North East Water (NEW) is seeking to engage a suitably qualified Principal Contractor under a Design and Construct (D&C) contract for the upgrade Middle Creek Sewage Pumping Station (SPS) and Baranduda SPS.
The two SPS's are located at different sites within Wodonga, and each site upgrade will be split into separable portions in the contact. Middle Creek SPS is located north of Baranduda Boulevard, and Baranduda SPS is located within the Baranduda WWTP which is north-east of Whytes Road. The works will include upgrade of pumps and switchboards at both of the sites and other minor upgrades to the Baranduda WWTP.
The contractor will be responsible for all associated works, including but not limited to the following:
• Upgrade to SPS Pumps (both sites).
• Upgrade to switchboards (both sites).
• New electrical mains, conduits and pits from existing transformer (both sites).
• New transfer pump, pipework and fitting between Lagoon 3 to Lagoon 2 (Baranduda WWTP).
• Modification to Baranduda SPS rising main, including new pits to house flow meter and actuated values (Baranduda WWTP).
• New gravity flowmeter at inlet to Baranduda WWTP (Baranduda WWTP).
Level sensors and upgrade to existing weir at Baranduda WWTP (Baranduda WWTP).
TenderHub gathers information continuously from a variety of sources. There may be delays between information being updated at the source and presented here. Always check with the source if you are concerned about currency or accuracy.
Key details
- Buyer
- North East Water
- Source
- Buying for Victoria
Briefings & site visits
No briefings or site visits were listed for this tender.
Awarded suppliers
1Contract awarded
$2,033,771 awarded to 1 supplier
Girdwood Contracting P/L
$2,033,771
ABN 70106454308
See who else bid on this tender
Subscribers see every supplier who bid on this tender, plus its change history and a direct link to the source notice.