Back

WA Botanic Gardens and Parks Authority

Provision of Air Conditioning Upgrade works for Biodiversity and Conservation Centre, Kings Park

AwardedRequest for Tender

Details

Awarded

Description

The BGPA is currently embarking on planned upgrade works to the heating, cooling, air conditioning and ventilation system to the existing Biodiversity Conservation Centre, which consists of two floors

  • Ground level comprises a combination of shared open office spaces, six (6) enclosed offices, entry spaces and corridors
  • Level 1 includes thirteen (13) enclosed office spaces, a shared open office space, entry spaces, and corridors

Works are to be conducted during working hours and staff will be vacated on a “floor by floor” basis as required during the works period to enable the successful contractor to speedily execute the works.

This Request for Tender (RFT) invitation will set the parameters for the selection of a Construct Only Contractor.

Request type

Request for Tender

TenderHub gathers information continuously from a variety of sources. There may be delays between information being updated at the source and presented here. Always check with the source if you are concerned about currency or accuracy.

Key details

Source
Tenders WA

Briefings & site visits

No briefings or site visits were listed for this tender.

Awarded suppliers

1

Contract awarded

$896,616 awarded to 1 supplier

See who else bid on this tender

Subscribers see every supplier who bid on this tender, plus its change history and a direct link to the source notice.