Back

WA South Metropolitan Health Service

Fremantle Hospital, D Block, Level 5 (D5) Clinical Fitout and T Block, Level 6 (T6) Office Fitout

AwardedRequest for Tender

Details

Awarded

Description

The Works comprise of fitout works to D Block, Level 5 (D5 - clinical fitout) and T Block, Level 6 (T6 - office fitout). Both sites are physically at first floor level.

D5 is a decommissioned clinical ward, which is being partially altered and upgraded to come back into service as a clinical facility. There are localised demolition and service alterations involved in these works. The masonry demolition is to be scheduled on weekends only (Sat & Sun working time is to be utilized). The number of patient bays and associated servicing remains the same, with only alterations as required to upgrade to current standards. There are layout changes to support spaces being addition of 2 EnSuites, reception area, office areas and re-establishment of services in various other rooms.

T6 is a laboratory facility in open plan and closed rooms layout. There are significant demolition and service disconnection and removals involved in these works. The masonry demolition is to be scheduled on weekends only (Sat & Sun working time is to be utilized). The area is to be refitted as modern office facilities, with 2 kitchenettes, photocopy room, new server room and other support spaces incorporated.

Request type

Request for Tender

TenderHub gathers information continuously from a variety of sources. There may be delays between information being updated at the source and presented here. Always check with the source if you are concerned about currency or accuracy.

Key details

Source
Tenders WA

Briefings & site visits

No briefings or site visits were listed for this tender.

Awarded suppliers

1

Contract awarded

$2,846,319 awarded to 1 supplier

See who else bid on this tender

Subscribers see every supplier who bid on this tender, plus its change history and a direct link to the source notice.