Gippsland Water
Moondarra Spillway and Plunge Pool Upgrade – Stage 2
Details
Description
This specification details the requirements for the stabilisation and surface protection of the existing rock face and plunge pool at the Moondarra Reservoir spillway. Works stages have been defined to mitigate risks associated with vertical interaction during construction. The works stages are defined below:
• Stage 1 comprises of works at the crest of the rock face in areas with existing shotcrete
protection - Complete
• Stage 2 comprises of works on the steeply dipping rock face – This Contract
• Stage 3 comprises of works at the toe of the steeply dipping rock face and in the plunge pool
floor. – Future Works
TenderHub gathers information continuously from a variety of sources. There may be delays between information being updated at the source and presented here. Always check with the source if you are concerned about currency or accuracy.
Key details
- Buyer
- Gippsland Water
- Source
- Buying for Victoria
Briefings & site visits
No briefings or site visits were listed for this tender.
Awarded suppliers
1Contract awarded
$281,037 awarded to 1 supplier
Jones Civil Gorup
$281,037
See who else bid on this tender
Subscribers see every supplier who bid on this tender, plus its change history and a direct link to the source notice.