Description

Stage 1 – Concrete Footpath

• Removal and tipping of existing footpath and grass as specified in Appendix A and as identified on site by DEC Project Manager
• Supply and install new concrete footpath as specified in Appendix A
• Traffic management including signage at all times for pedestrians and cyclists
• Construction site containment and public safety to be ensured at all times and be approved by DEC Project Manager
• Removal of existing problem tree roots and installation of root barrier systems as required and as specified by DEC Project Manager
• Replacement of all broken reticulation and relocation of all reticulation as needed and as specified by DEC Project Manager.

Stage 2 – Paved Footpath

• Supply and install new brick paved footpath from footpath around picnic table and rotunda as specified in Appendix A.

Request type

Request for Tender

TenderHub gathers information continuously from a variety of sources. There may be delays between information being updated at the source and presented here. Always check with the source if you are concerned about currency or accuracy.

Key details

Source
Tenders WA

Briefings & site visits

No briefings or site visits were listed for this tender.

Awarded suppliers

1

Contract awarded

$170,682 awarded to 1 supplier