QLD Department of Transport and Main Roads
Transport, Installation and Removal of Sheet Piles
Details
Description
RoadTek are undertaking bridge rehabilitation works on the Bowen Road Bridge, Townsville, from chainage Ch: 5.766 to Ch: 5.999km as shown in the locality plan. The project includes rehabilitation of concrete piles and pile caps of the bridge.
As part of the works RoadTek are required to construct a temporary access track / bund wall and sheet pile wall that will allow the works to be undertaken in the dry. The wall is to be suitable to maintain access and protect the works through all tides. The wall is to be installed as per the design specifications in these tender documents.
The Bowen Road Bridge is a tidal saltwater environment. The bridge is located on Bowen Road in Townsville between Rosslea and Idalia and this is an urban environment with predominantly housing surrounding the river. Strict environmental controls will influence the works including, noise, vibration, air quality, water quality and treatment, acid sulphate soils, erosion and sediment control and fauna and flora management
Locations
Request type
Request for Tender
TenderHub gathers information continuously from a variety of sources. There may be delays between information being updated at the source and presented here. Always check with the source if you are concerned about currency or accuracy.
Key details
- Source
- QLD QTenders
Briefings & site visits
No briefings or site visits were listed for this tender.
Awarded suppliers
1Contract awarded
$276,397 awarded to 1 supplier
N Q Civil Contractors
$0
P O Box 328 , Deeragun, Townsville, QLD, Australia, 4818
See who else bid on this tender
Subscribers see every supplier who bid on this tender, plus its change history and a direct link to the source notice.