Stanwell Corporation Limited
Supply and Install Flue Gas Continuous Emission Monitoring Systems
AwardedExpression of Interest
Details
Awarded
Description
Stanwell Power Station intends to upgrade its continuous emissions monitoring systems to meet its environmental objectives. The current installed instrumentation is approaching the end of its operating life. This instrumentation requires high maintenance to maintain accuracy and availability, and is no longer well supported by the OEM.
The systems to be installed will provide monitoring of the boiler flue gas streams. Measurements provided by the system will be also used for control and protection to prevent the generating units from exceeding environmental license limits. (Generating unit load runbacks and trips)
The systems to be installed will provide monitoring of the boiler flue gas streams. Measurements provided by the system will be also used for control and protection to prevent the generating units from exceeding environmental license limits. (Generating unit load runbacks and trips)
Locations
Request type
Expression of Interest
TenderHub gathers information continuously from a variety of sources. There may be delays between information being updated at the source and presented here. Always check with the source if you are concerned about currency or accuracy.
Key details
- Source
- QLD QTenders
Briefings & site visits
No briefings or site visits were listed for this tender.
Awarded suppliers
3Contracts awarded
$1 awarded to 3 suppliers
See who else bid on this tender
Subscribers see every supplier who bid on this tender, plus its change history and a direct link to the source notice.