Goulburn Valley Water
Seymour Wastewater Management Facility (WMF) Third Party Irrigation Stage 1 Pipeline
Details
Description
All GVW Contractors who tender for work with a total of 100k or more will be required to have a third party certified safety system e.g. AS/NZS 4801:2001
This stage one works is for the Irrigation pipeline and its submains. The rising main is a DN450 PN12.5 Irrigation Pipeline with under bores (or open cut of one) of Native Vegetation (x1 or 2), a Creek (x1) under bore and Open Cut over two adjacent Gas Pipelines. Includes supply and install of submains of various smaller sizes going into the landowners on farm works. Includes wider drainage and access track upgrades.
TenderHub gathers information continuously from a variety of sources. There may be delays between information being updated at the source and presented here. Always check with the source if you are concerned about currency or accuracy.
Key details
- Source
- Buying for Victoria
Briefings & site visits
No briefings or site visits were listed for this tender.
Awarded suppliers
1Contract awarded
$1,164,285 awarded to 1 supplier
Girdwood Contracting P/L
$1,164,285
ABN 70106454308
See who else bid on this tender
Subscribers see every supplier who bid on this tender, plus its change history and a direct link to the source notice.