Goulburn Valley Water

Seymour Wastewater Management Facility (WMF) Third Party Irrigation Stage 1 Pipeline

AwardedRequest for Tender

Details

Awarded

Description

All GVW Contractors who tender for work with a total of 100k or more will be required to have a third party certified safety system e.g. AS/NZS 4801:2001

This stage one works is for the Irrigation pipeline and its submains. The rising main is a DN450 PN12.5 Irrigation Pipeline with under bores (or open cut of one) of Native Vegetation (x1 or 2), a Creek (x1) under bore and Open Cut over two adjacent Gas Pipelines. Includes supply and install of submains of various smaller sizes going into the landowners on farm works. Includes wider drainage and access track upgrades.

Locations

Request type

Request for Tender

TenderHub gathers information continuously from a variety of sources. There may be delays between information being updated at the source and presented here. Always check with the source if you are concerned about currency or accuracy.

Key details

Source
Buying for Victoria

Briefings & site visits

No briefings or site visits were listed for this tender.

Awarded suppliers

1

Contract awarded

$1,164,285 awarded to 1 supplier

  • Girdwood Contracting P/L

    $1,164,285

    ABN 70106454308

See who else bid on this tender