WA Public Transport Authority
New Perth Stadium Transport - Rail Reserve Ground Improvement - Phase 1 Works
AwardedRequest for Tender
Details
Awarded
Description
The PTA is responsible for the planning and delivery of the associated Transport Infrastructure for the State Government’s proposed new Perth Stadium on the Burswood peninsula. The State Government of Western Australia is planning a new 60,000 to 70,000 seat major sports stadium and sports precinct at Burswood, Western Australia. An upgrade of the existing transport infrastructure in the area of the sports precinct is planned to occur concurrently with the stadium development to cater for the increase in patronage resulting from the proposed development. The components of the transport infrastructure upgrade that are covered are:
a) Construction of two additional rail platforms and enlargement of the existing central platform at the Belmont Park Station which will become the new Perth Stadium Station.
b) Duplication, and in places triplication, of the existing Armadale line dual track railway plus associated track realignment, between the Goongoongup Rail Bridge (GRB) and the Burswood Station. The length of track duplication is approximately 1.9 km, from chainage 1220 to 3100. The duplication is partly within the existing rail corridor.
To facilitate timely and cost-effective construction of the project, a program of forward works is planned. The forward works will include ground improvement, placement of fill to widen part of the existing railway embankment and to raise the formation level. The fill is expected to cause significant settlement as a result of compression of an underlying stratum of alluvial silt and clay referred to as Swan River Alluvium (SRA).
a) Construction of two additional rail platforms and enlargement of the existing central platform at the Belmont Park Station which will become the new Perth Stadium Station.
b) Duplication, and in places triplication, of the existing Armadale line dual track railway plus associated track realignment, between the Goongoongup Rail Bridge (GRB) and the Burswood Station. The length of track duplication is approximately 1.9 km, from chainage 1220 to 3100. The duplication is partly within the existing rail corridor.
To facilitate timely and cost-effective construction of the project, a program of forward works is planned. The forward works will include ground improvement, placement of fill to widen part of the existing railway embankment and to raise the formation level. The fill is expected to cause significant settlement as a result of compression of an underlying stratum of alluvial silt and clay referred to as Swan River Alluvium (SRA).
Locations
Categories
Request type
Request for Tender
TenderHub gathers information continuously from a variety of sources. There may be delays between information being updated at the source and presented here. Always check with the source if you are concerned about currency or accuracy.
Key details
- Source
- Tenders WA
Briefings & site visits
No briefings or site visits were listed for this tender.
Awarded suppliers
1Contract awarded
$672,938 awarded to 1 supplier
Ertech Geomarine Pty Ltd
$672,938
118 Motivation Drive, Wangara WA Australia 6065
See who else bid on this tender
Subscribers see every supplier who bid on this tender, plus its change history and a direct link to the source notice.