WA Public Transport Authority
Control Systems Infrastructure Replacement
Details
Description
This project will replace the servers and storage that are managed by Operational Technology and used by Transperth Train Operations to manage the Perth Metropolitan Train Network. The existing infrastructure at both the Public Transport Centre (PTC) and Perth Underground requires additional capacity to cater for the upcoming METRONET services (Forrestfield Airport Link, Morley-Ellenbrook, Yanchep, Thornlie-Cockburn, and Byford); much of the equipment has reached end of life and has limited vendor support. The equipment that has vendor support also needs replacing, as it does not conform to the current Public Transport Authority (PTA) server architecture standards. The servers and storage at both locations will be replaced as part of this project. This implementation of the new hardware will cater for planned network growth and reduce maintenance costs. The project will move all control systems infrastructure onto virtual machines (VMs) as part of increasing the Control Systems capacity.
Locations
Categories
Request type
Request for Tender
TenderHub gathers information continuously from a variety of sources. There may be delays between information being updated at the source and presented here. Always check with the source if you are concerned about currency or accuracy.
Key details
- Source
- Tenders WA
Briefings & site visits
No briefings or site visits were listed for this tender.
Awarded suppliers
1Contract awarded
$1,193,112 awarded to 1 supplier
$1,193,112