Back

Queensland Rail Limited

Central West Timber Bridge Replacement - Stage 2

AwardedRequest for Tender

Details

Awarded

Description

The location of the 22 bridge sites are within the Central West system, located on the Central Line between Emerald and Winton, and the Blair Athol line from Emerald to Clermont.The locations of the sites are further defined on the Location Plan contained in the information package along with Km point, current span configuration, bridge length and average height. This design and construct contract is for the full replacement of the bridge or elimination using only reinforced concrete culverts.

Request type

Request for Tender

TenderHub gathers information continuously from a variety of sources. There may be delays between information being updated at the source and presented here. Always check with the source if you are concerned about currency or accuracy.

Key details

Source
QLD QTenders

Briefings & site visits

No briefings or site visits were listed for this tender.

Awarded suppliers

1

Contract awarded

$14,433,930 awarded to 1 supplier

See who else bid on this tender

Subscribers see every supplier who bid on this tender, plus its change history and a direct link to the source notice.