Queensland Hydro
Environmental Study Borumba PHES Land Resources
Details
Description
Queensland Hydro Pty Ltd (Queensland Hydro) is a publicly owned entity established by the Queensland Government to design, deliver, operate and maintain long duration pumped hydro energy storage assets that will be the cornerstone for the transformation of the state’s energy system. This transformed energy system will predominantly rely on wind and solar energy generation, complimented by dispatchable energy sources such as batteries and pumped hydropower energy storage (PHES). Long duration PHES will be a critical component of this future energy mix.
Queensland Hydro is seeking Tenders for a suitably qualified service provider to deliver Environmental Land Resources technical studies in support of the Borumba PHES project EIS submission.
The environmental land resources technical studies statement of work comprises three separate portions; land resources (soil and geology), contaminated land, and waste as detailed in the Scope of Works attachment.
Locations
Request type
Request for Tender
TenderHub gathers information continuously from a variety of sources. There may be delays between information being updated at the source and presented here. Always check with the source if you are concerned about currency or accuracy.
Key details
- Buyer
- Queensland Hydro
- Source
- QLD QTenders
Briefings & site visits
No briefings or site visits were listed for this tender.
Awarded suppliers
1Contract awarded
$230,993 awarded to 1 supplier
$230,993
Level 1/22-30 Wood Street, -, Mackay, QLD, Australia, 4740
View supplier insights
See who else bid on this tender
Subscribers see every supplier who bid on this tender, plus its change history and a direct link to the source notice.