Back
Bradfield Development Authority
WPCA000177 - Stormwater Trunk Infrastructure Design - WPCA000177 - Stormwater Trunk Infrastructure Desig-1
AwardedRequest for Tender
Details
Awarded
Description
Description
A project to be undertaken
Description of the goods and services to be provided
Project Overview The WPCA is tasked with the design and delivery of the Bradfield City Centre – creating a dynamic new place for people to live, work and learn. The Bradfield City Centre comprises a total land area of 114.9ha of land located at 215 Badgery’s Creek Road. The first phase of creation involves the delivery of approximately 20 hectares in the western portion of the site. Concurrent Engagements As part of the first phase of City creation, several concurrent activities are occurring involving a number of consultants that have been engaged or are in the process of being engaged. The main engagement that the Sewer Pump Station and Stormwater Infrastructure Consultant will interface with is the First Stage Enabling Works Head Consultant. The First Stage Enabling Works Head Consultant will provide the following services: • Civil Works: Site gradings, earthworks, road pavements, piped and open stormwater drainage and coordination with streetscape landscaping. • Water Utilities: Potable and recycled water reticulation mains, and stormwater network for non-potable water uses. • Digital Smart City: Providing for all the digital plumbing including pits and pipes, smart poles and connections to the future communication data centres • Electrical Utilities: Providing for all the electrical reticulation network to service the wider precincts with Bradfield City Centre. • Waste: Design of a dedicated organic food collection pressure pipe system and collection tank for all the organic food waste to enable waste to energy opportunities. The collection tank will connect to the sewer pump station for overflow discharge. Services under this Engagement The following design work and construction phase services are envisaged to be managed and delivered by the consultant: • Stormwater Design: detailed modelling for all aspects of precinct wide stormwater quality and quantity to allow the concept design of the stormwater management strategy infrastructure for the entire Bradfield City Centre. Detailed design of Parkland West aspects of the stormwater infrastructure along Moore Gully. Detailed design of Parkland East aspects of the stormwater infrastructure along Thompson Creek. • Technical Advice: provision of technical advice and design solutions for options (allow consideration of 2 options) for servicing Bradfield City Centre’s recycled water demand from utilising on-site stormwater.
TenderHub gathers information continuously from a variety of sources. There may be delays between information being updated at the source and presented here. Always check with the source if you are concerned about currency or accuracy.
Key details
- Source
- Buy NSW
Briefings & site visits
No briefings or site visits were listed for this tender.
Awarded suppliers
1Contract awarded
$1,254,983 awarded to 1 supplier
$1,254,983
ABN 17007820322
Level 28 600 Bourke Street Melbourne vic 3000 AU
View supplier insights
See who else bid on this tender
Subscribers see every supplier who bid on this tender, plus its change history and a direct link to the source notice.