QLD Department of Agriculture and Fisheries
Wacol Piggery Demolition
Details
Description
DESCRIPTION OF SCOPE – GENERAL
Except as otherwise expressly provided herein, contractor shall supply all labour, supervision, consumable materials, equipment, tools, services, and every item of expense necessary for the demolition and removal of buildings including footings, foundations, roadways and associated infrastructure at Wacol Pig Research Centre.
It is the responsibility of the Tenderer to inform themselves fully of all circumstances and conditions relating to the Contract including but not limited to inspecting the site, labour and plant and all risks and contingencies likely to affect their quote. A mandatory site visit will be held and details are provided in Section 4. If the Tenderer has any doubt as to the meaning of any part of the documents they shall obtain clarification in writing from the person named in the Tender Response Forms, and shall satisfy themselves as to the correctness and sufficiency of their quote. No extras will be paid for any item that should reasonably have been foreseen by taking these precautions.
Construction/Demolition is to be carried out in accordance with Australian Standards, the Building Code of Australia and the Demolition Work Code of Practice 2013 and the works should be carried out with minimal disruption to the public.
The Department ideally requires practical completion by 14 June 2019.
DESCRIPTION OF SCOPE OF WORK – SPECIFIC OVERVIEW
The Contractor is responsible for the:
• Removal and disposal of all asbestos containing materials (ACMs)
• Demolition and removal of six (6) buildings, two (2) large and four (4) small.
• Demolition and removal of Roadways, silos, external drainage, septic tanks, associated works
• Project management and co-ordination with subcontractor/s
• The on-site period has been nominated at nine (9) weeks from contract commencement. It is required that the contractor schedule the on-site works to meet these nominated times in order to minimise interruption to ongoing operations.
Refer to Section 7 for full specification details
Locations
Categories
Request type
Request for Tender
TenderHub gathers information continuously from a variety of sources. There may be delays between information being updated at the source and presented here. Always check with the source if you are concerned about currency or accuracy.
Key details
- Source
- QLD QTenders
Briefings & site visits
- Site visit Mandatory
14 June 2019
DESCRIPTION OF SCOPE – GENERAL
Except as otherwise expressly provided herein, contractor shall supply all labour, supervision, consumable materials, equipment, tools, services, and every item of expense necessary for the demolition and removal of buildings including footings, foundations, roadways and associated infrastructure at Wacol Pig Research Centre.
It is the responsibility of the Tenderer to inform themselves fully of all circumstances and conditions relating to the Contract including but not limited to inspecting the site, labour and plant and all risks and contingencies likely to affect their quote. A mandatory site visit will be held and details are provided in Section 4. If the Tenderer has any doubt as to the meaning of any part of the documents they shall obtain clarification in writing from the person named in the Tender Response Forms, and shall satisfy themselves as to the correctness and sufficiency of their quote. No extras will be paid for any item that should reasonably have been foreseen by taking these precautions.
Construction/Demolition is to be carried out in accordance with Australian Standards, the Building Code of Australia and the Demolition Work Code of Practice 2013 and the works should be carried out with minimal disruption to the public.
The Department ideally requires practical completion by 14 June 2019.
DESCRIPTION OF SCOPE OF WORK – SPECIFIC OVERVIEW
The Contractor is responsible for the:
• Removal and disposal of all asbestos containing materials (ACMs)
• Demolition and removal of six (6) buildings, two (2) large and four (4) small.
• Demolition and removal of Roadways, silos, external drainage, septic tanks, associated works
• Project management and co-ordination with subcontractor/s
• The on-site period has been nominated at nine (9) weeks from contract commencement. It is required that the contractor schedule the on-site works to meet these nominated times in order to minimise interruption to ongoing operations.
Refer to Section 7 for full specification details
Awarded suppliers
1Contract awarded
$73,000 awarded to 1 supplier
Logan City Demolition Pty Ltd
$0
11/8-14 Saint Jude Court, Browns Plains, QLD , 4118, Australia
See who else bid on this tender
Subscribers see every supplier who bid on this tender, plus its change history and a direct link to the source notice.