SA Water Corporation
A feasibility study on nutrient load reduction options for the upper cox creek catchment
Details
Description
On behalf of a cross-agency Steering Committee, SA Water is seeking to conduct a study to assist the Committee in determining the most appropriate options for reducing nutrient loads from the Upper Cox Creek water supply catchment.
The overall objective of the project is to conduct a feasibility study of nutrient load reduction options involving a (potential) mix of engineering, regulatory and community engagement – type solutions. The feasibility study should conclude with recommendations on a preferred mix of options that has taken into account social, environmental and economic considerations
Locations
Request type
Request for Tender
TenderHub gathers information continuously from a variety of sources. There may be delays between information being updated at the source and presented here. Always check with the source if you are concerned about currency or accuracy.
Key details
- Buyer
- SA Water Corporation
- Source
- SA Tenders and Contracts
Briefings & site visits
No briefings or site visits were listed for this tender.
See who else bid on this tender
Subscribers see every supplier who bid on this tender, plus its change history and a direct link to the source notice.