BLUESCOPE NO. 6 BLAST FURNACE RELINE PROJECT - Hydraulics and Lube System Refurbishment Supply and Site works (M2102-MJW)
Details
Description
Estimated Value Range >A$1.0 million
BlueScope has completed development for the scope of work and estimate for a furnace reline, repair and upgrade of ancillary equipment/plant/systems allowing 6BF to re-start a second campaign to replace the production of existing No. 5 Blast Furnace when it completes its current production campaign.
In August 2023 the project was approved to move into execution.
The full announcement and information details can be found at the following link -https://wcsecure.weblink.com.au/pdf/BSL/02699304.pdf.
The first ('Early Works') stage of the Execution phase is currently scheduled for the period to approximately August 2024, focusing on works that prepare the furnace and associated plant for the commencement of the reline itself and installation of new equipment. Early Works will also be conducted where early completion aids in managing resource levels across the entire reline works period.
The second stage will be the balance of Execution works, completed over an approximately two-year period from September 2024 to August 2026.
Procurement will be undertaken directly by the BlueScope project team utilising ICN to assist with identifying potential suppliers and contractors.
6BF initial build and 5BF's last reline included significant commonality of equipment, systems and materials with each other. Commonality relates to the use of materially similar equipment, materials and or technology/systems. Based on the current 5BF's performance, there are significant aspects of the design and or equipment and or materials (commonality items) whose performance on No. 5 Blast Furnace BlueScope require to be utilised on No. 6. The utilisation of these commonality items will assist BlueScope to retain the production and asset life and business return benefits achieved from these elements in No. 5 Blast Furnace into the second campaign of No. 6 Blast Furnace.
ICN will manage the EOI phase(s) and be the conduit for responding to EOI submission queries and or status
BlueScope will directly issue tenders to and correspond with selected tenderer(s).
BlueScope will advise tenderers of their success or otherwise and where requested will provide feedback
How to register an Expression of Interest (EOI)
- Work Packages currently available to submit an EOI for are listed in the 'Work Packages' tab above. Refer to theEOI User Guide below for instructions and assistance to submit an EOI.
- To submit an initial EOI for the work packages, companies must have an ICN Gateway company profile. Information on how to register your company on ICN Gateway is detailed below.
ICN Gateway Company Registration
- Clickhereto register your company profile on ICN Gateway.
- Support and assistance is available through the web links listed below.
- Your company summary and company description are used to assess your ability to complete projects when you lodge an EOI - please ensure that your company invests the time and energy required to represent your company in the most effective manner possible.
TenderHub gathers information continuously from a variety of sources. There may be delays between information being updated at the source and presented here. Always check with the source if you are concerned about currency or accuracy.
Key details
- Source
- Gateway by ICN
Briefings & site visits
No briefings or site visits were listed for this tender.
Awarded suppliers
1Contract awarded
1 supplier has won this tender
CRAM FLUID POWER
$0
10 Glastonbury Avenue Unanderra NSW 2526 Australia, +61 02 4272 4092
See who else bid on this tender
Subscribers see every supplier who bid on this tender, plus its change history and a direct link to the source notice.