The Northern Lefevre Peninsula (NLP) Osborne North Infrastructure Headworks project - Package 1 includes the following components:

• Osborne North Primary Headworks.
• Osborne North Secondary Headworks – Stage 1.

The Osborne North Primary Headworks includes the construction of the extension of Mersey Road from the Techport Australia site to Pelican Point Road (13 m wide road, 1950 m in length, of which approximately 350 m is upgrading existing road pavement) includes rebuilding of the Pelican Point Road intersection and the driveway access points for International Power and ABB Grain; together with construction of associated stormwater drainage and rising main, electrical reticulation and lighting, low pressure sewer, potable water, common service trenches and landscaping of stormwater systems. This package also requires improvements to the local stormwater system by means of construction of a series of swales and detention basins, including a drainage structure under the ARTC and ABB rail corridor.

Request type

Expression of Interest

TenderHub gathers information continuously from a variety of sources. There may be delays between information being updated at the source and presented here. Always check with the source if you are concerned about currency or accuracy.

Key details

Source
SA Tenders and Contracts

Briefings & site visits

No briefings or site visits were listed for this tender.

See who else bid on this tender

Subscribers see every supplier who bid on this tender, plus its change history and a direct link to the source notice.