The purpose of the Scope of Works (SOW) is to provide the expectations for the Independent Sustainability Auditor for the purposes of meeting the Infrastructure Sustainability Council (ISC) v1.2 credit requirements for Man-3 and Man-4. The audit duration required for this Proposal should be based on the following frequency outlined in Table 21. TABLE 21: ISC REQUIRED FRECQUENCY Credit Frequency Design Construction MAN-3 Quarterly Bi-annually MAN-4 Once Annually The Project is currently in the establishment period until approximately June 2024. The Design phase will run until approximately mid 2026 with the completion of detailed design. Construction is planning to commence in January 2025 and targeting completion by Q4 2028. Noting these are all estimated timelines and are subject to change. The first audit is required in May 2024, to help ensure we are on the right track from the establishment period. The scope of the audit should meet the criteria of the ISC v1.2 Man-3, level 2 credit for an independent sustainability professional to be engaged to monitor and review sustainability performance. The scope will also satisfy the criteria for the Man-4 credit, level 2, with the most material sustainability issues to be determined with the project team prior to undertaking the audit. Outputs should include as a minimum a preliminary findings spreadsheet, a draft audit report with recommendations, identified opportunities for improvement, any non-conformances noted and a final audit report. Please provide pricing information for the cost associated with undertaking the scope for works listed above. Please provide pricing per audit.

Overview

The Central-West Orana Renewable Energy Zone (REZ) Transmission Project will build new high-capacity transmission lines, energy hubs and supporting infrastructure to transfer power generated by solar and wind projects to electricity consumers. The new infrastructure is expected to be operational by 2028 and will initially unlock up to 4.5 gigawatts of new network capacity.

The project consists of 90km of 500kV overhead transmission lines and 150 km of 330kV transmission lines for generator connections, stretching from Elong Elong in the west through to Barigan Creek in the east, via an energy hub at Merotherie.

ACEREZ, a partnership of ACCIONA, COBRA, and Endeavour Energy, has been appointed by EnergyCo as the network operator to design, build, finance, operate, and maintain the Central-West Orana REZ transmission project.

Learn more about related opportunities with renewable energy zones.

EnergyCo NSW REZ and PTIPs page: https://gateway.icn.org.au/projects/12181

Overview

EnergyCo leads the delivery of renewable energy zones (REZs) to ensure long-term energy security for NSW.

These zones will harness the state's abundant wind and solar resources to keep the lights on and deliver clean, affordable and reliable electricity to everyone in the state.

The work EnergyCo is doing under the NSW Government's Electricity Infrastructure Roadmap (the Roadmap) involves upgrading the grid to connect new generation and storage projects into the electricity system.EnergyCo is seeking registrations of general interest from suppliers and contractors at all levels of project delivery. Companies that have registered will be notified of specific work packages as the project procurement proceeds, and invited to register specific interest. Please register your interest for project updates under the 'Work Packages' tab above.



Locations

Request type

Work Package

TenderHub gathers information continuously from a variety of sources. There may be delays between information being updated at the source and presented here. Always check with the source if you are concerned about currency or accuracy.

Key details

Buyer
ACEREZ
Source
Gateway by ICN

Briefings & site visits

No briefings or site visits were listed for this tender.

See who else bid on this tender

Subscribers see every supplier who bid on this tender, plus its change history and a direct link to the source notice.