Back

SA Department for Water

Inclusion on a Panel of Engineering Consultants for the Detail Design and Documentation of the Bald Hill and Winpinmerit drains, and the REFLOWS Project

AwardedExpression of Interest

Details

Awarded

Description

The Upper South East Dryland Salinity and Flood Management Program was developed in the early 1990?s to address one of the most significant areas of dryland salinity in the State.

The USE Program is also looking to partially restore historical surface water flows from the Lower South East into wetlands of the Upper South East that have declined in health from lack of water. The ?REFLOWS Project? has identified two routes that are necessary for the delivery of the required outcomes, to restore flows to the upper south east of South Australia)

The Infrastructure and Business Division requires a professional Engineering Consulting firm to carry out the Detail Design and Documentation for the Bald Hill and Winpinmerit drains, that form part of the USE Program, and the Eastern and Western floodways that form part of the REFLOWS Project.

Request type

Expression of Interest

TenderHub gathers information continuously from a variety of sources. There may be delays between information being updated at the source and presented here. Always check with the source if you are concerned about currency or accuracy.

Key details

Source
SA Tenders and Contracts

Briefings & site visits

No briefings or site visits were listed for this tender.

See who else bid on this tender

Subscribers see every supplier who bid on this tender, plus its change history and a direct link to the source notice.