Westernport Water
San Remo to Newhaven Bridge Pipeline Fittings Renewal Project (Design and Construct)
Details
Description
The Principal is seeking tenders from suitably qualified and experienced contractors for the provision of supply and construction of the following items for the three Westernport Water pipelines connected to the underside of the San Remo Bridge;
Replacement of the MSCL pipe supports (126 units).
Treatment and preparation of the MSCL pipe surface and wrapping (640m).
Replacement/Refurbishment of the GRP pipe supports (126 Sets).
Refurbishment of protection screens that are located under the GRP pipes for 8 spans of the bridge.
A mandatory site inspection is required. Westernport Water will make two dates available
and the tenderer is only to attend one. The dates are as follows;
22nd June 2022 at 10am
24th June 2022 at 10am
This will be held underneath Span 1 of the bridge (San Remo side). Please inform attendance
via email to Chris Coulthurst as per below.
All submissions must be lodged via Tenderlink www.portal.tenderlink.com/westernportwater/
Locations
Request type
Request for Tender
TenderHub gathers information continuously from a variety of sources. There may be delays between information being updated at the source and presented here. Always check with the source if you are concerned about currency or accuracy.
Key details
- Buyer
- Westernport Water
- Source
- Buying for Victoria
Briefings & site visits
No briefings or site visits were listed for this tender.
Awarded suppliers
1Contract awarded
$1,000 awarded to 1 supplier
Freyssinet Australia
$1,000
ABN 15002617736
See who else bid on this tender
Subscribers see every supplier who bid on this tender, plus its change history and a direct link to the source notice.