WA Public Transport Authority
Communications and Low Voltage Design - Alignment of Signals and Overhead Line Equipment (OLE) with Track - Bassendean
AwardedSelect Tender
Details
Awarded
Select tender
This is a select tender. Details and access to the source may be limited to invited suppliers only.
Description
The PTA intends to enable signalled turnback movement functionality at existing Bassendean turnback to minimise the impact of disruptive events on scheduled train operations and improve operational flexibility during partial line closures on outer Midland line in the long term. The works will include electrification of the existing unwired crossover between points 763A and 763B. This will require decommissioning of an existing isolator, 2x booster transformers, and commissioning of 2x new motorised isolators. The project engineering and construction works interface with signalling, overhead, communications, operational technology, and track disciplines. The Scope of Services is separated into three design packages, Design Package 1 – Communications DesignDesign Package 2 – Low Voltage DesignDesign Package 3 – Undertrack crossing for conduits/ cables
TenderHub gathers information continuously from a variety of sources. There may be delays between information being updated at the source and presented here. Always check with the source if you are concerned about currency or accuracy.
Key details
- Source
- Tenders WA
Briefings & site visits
No briefings or site visits were listed for this tender.
Awarded suppliers
1Contract awarded
$230,820 awarded to 1 supplier
$230,820
Level 14, 109 St George's Terrace, Perth WA Australia 6000
View supplier insights
See who else bid on this tender
Subscribers see every supplier who bid on this tender, plus its change history and a direct link to the source notice.