WA Department of Energy, Mines, Industry Regulation and Safety
Ellendale Deconstruction
Details
Description
This RFT and associated documents relates to Works at Ellendale Mine Site for the safe deconstruction and removal of all remaining infrastructure, plant and equipment (including general rubbish and debris) from the Ellendale site and to dispose of all materials, waste and general rubbish in appropriately designated waste facilities.
The liquidator’s auction was undertaken in September 2015, disposing of much of the valuable items of plant and infrastructure associated with the Ellendale site. Removal of plant and equipment appears to have been unmanaged and the remaining inoperable and redundant plant infrastructure is considered to be in an unsafe state. There are two main plant areas and numerous laydowns and supporting infrastructure areas. The prime objective of the works program is to make safe the areas around the E9 and E4 mine sites.
TenderHub gathers information continuously from a variety of sources. There may be delays between information being updated at the source and presented here. Always check with the source if you are concerned about currency or accuracy.
Key details
- Source
- Tenders WA
Briefings & site visits
No briefings or site visits were listed for this tender.
Awarded suppliers
1Contract awarded
$9,849,734 awarded to 1 supplier
Liberty Industrial
$9,849,734
Suite 7 136 Main Street Osborne Park WA 6017, Osborne Park WA Australia 6017
See who else bid on this tender
Subscribers see every supplier who bid on this tender, plus its change history and a direct link to the source notice.