Back
WA Department of Housing and Works
Full Refurbishment of 11 Snook Way, Karratha
AwardedOther
Details
Awarded
Description
Pilbara Region – Karratha – Full Refurbishment Full refurbishment of 3 bedroom, 1 bathroom residential premises including wet areas, walls and ceilings, doors and windows, electrical plumbing, painting, external works and asbestos removal. The property was built in 1981 and is located in Wind Region D (Severe Cyclonic). The building is stumped with brick construction, has timber roof trusses and metal sheet covering, wall framing with external brick veneer and internal plaster cladding and steel floor beams.
TenderHub gathers information continuously from a variety of sources. There may be delays between information being updated at the source and presented here. Always check with the source if you are concerned about currency or accuracy.
Key details
- Source
- Tenders WA
Briefings & site visits
No briefings or site visits were listed for this tender.
Awarded suppliers
1Contract awarded
$441,891 awarded to 1 supplier
$441,891
Unit 2 / 2575 Augustus Dve, Karratha WA Australia 6714
View supplier insights
See who else bid on this tender
Subscribers see every supplier who bid on this tender, plus its change history and a direct link to the source notice.