Rest Area Facilities in the Wide Bay Region require upgrading this includes but is not limited to refurbishment.
Below is a list of all the required rest area ablution facilities that require repair or upgrades by 18 June 2021.
PDF's of all locations and GPS co-ordinates will be attached to this request. Rest Area photos my be provided on request.
Site 1 – Rest Area 74
- Box out and concrete extension of path from ramp to seal edge. Relocate bins out of the way.
- Repaint cubicle doors and attach unisex signs (including braille)
Site 2 – Rest Area 110
- Fix plumbing (urinal not flushing)
- Re-roof toilet block including clear panels
- Re-gutter toilet block
- Install epoxy flooring in toilets.
Site 3 – Rest Area 111
- Patch up and paint internal walls.
- Remove entry way concrete and replace with single apron to road edge
Site 4 – Rest Area 112
- Extensive clean
- Carry out plumbing repairs (ladies toilet leaking while flushing from seal joint at the back)
- Remove/ repaint graffiti
- Replace signs in toilet block (including braille)
Site 5 – Rest Area 107
- Repaint internal walls
- Apply epoxy flooring
- Replace entire roof
- Install urinal in Men's toilet
- Replace locks on doors
- Replace toilet signage (include braille)
- Add toilet paper dispensers
Site 6 – Rest Area 244
- Apply epoxy flooring
- Upgrade toilet block signage (include braille)
Site 7 – Rest Area 16
- New septic lid required
Site 8 – Rest Area 115
- Repaint interior and exterior
- Replace cubicle doors and framing
- Install epoxy flooring
- Upgrade signage (include braille)
Site 9 – Rest Area 21
- Repaint smaller toilet block inside.
- Re-roof both toilet blocks including clear panels and fall protection wire.
- Install epoxy flooring to both toilet blocks
Site 10 – Rest Area 17
- New septic lid required
Site 11 – Rest Area 108
- Repaint toilet block inside.
- Reroof toilet block including clear panels.
- Re-apply epoxy flooring.
- Replace pressure pump.
- Replace plumbing where required.
- Upgrade of signage on toilet block (including braille)
- New septic lid required
NOTE: Submitted offers are to be all inclusive of all costs IE labour, plant materials and any subcontract costs to provide the facilities mentioned above.
This request for quote may be awarded to more than one supplier.
Works schedule will have to be coordinated with the project manager so supplementary on-site activities can be carried out in a timely manner.
Works to be completed by 18/06/2021
Locations
Categories
Request type
Request for Tender
TenderHub gathers information continuously from a variety of sources. There may be delays between information being updated at the source and presented here. Always check with the source if you are concerned about currency or accuracy.
Key details
- Source
- QLD QTenders
Briefings & site visits
No briefings or site visits were listed for this tender.
Awarded suppliers
1Contract awarded
$131,755 awarded to 1 supplier
$0
4/5 Narabang Way, Belrose , NSW, Australia, 2085
View supplier insights
See who else bid on this tender
Subscribers see every supplier who bid on this tender, plus its change history and a direct link to the source notice.