Back

City of Playford

001443 Design Munno Para Sports Precint

AwardedRequest for Tender

Details

Awarded

Description

Council’s Sportsground Strategy has indicated the need for a regional sporting facility to be constructed in Munno Para. The location for this facility has been identified as part of the Playford Alive Masterplan adjacent to Mark Oliphant College on Newton Boulevard.

The facility is intended to be delivered in multiple stages with the first and Second stage as shown in Outerspace master plan Concept Dwg no OS807 CP02 Ref F to include the detailed design of carpark and “kiss and drop” for use by the school and sporting facility, the detailed design of a clubroom facility and single synthetic soccer pitch and the design up to 30% for the entire site in line with the master plan.

Request type

Request for Tender

TenderHub gathers information continuously from a variety of sources. There may be delays between information being updated at the source and presented here. Always check with the source if you are concerned about currency or accuracy.

Key details

Source
SA Tenders and Contracts

Briefings & site visits

No briefings or site visits were listed for this tender.

See who else bid on this tender

Subscribers see every supplier who bid on this tender, plus its change history and a direct link to the source notice.