Goulburn Valley Water
Seymour Waste Waster Management Facility Third Party Irrigation Stage 2 Pumping System
Details
Description
GVW Contractors who tender for work with a total of 100k or more will be required to have a third party certified safety system e.g. AS/NZS 4801:2001
Overall Scope of Works:
The works of this project is Staged and comprises of the design, supply, construction, testing and commissioning. Some of the design (irrigation pipeline, and preliminary pump station design) has already been undertaken. The status of the remaining staged works is summarised as follows:
- Stage 1 (separate Corporation/Principal let AS2124 tender/contract) which is predominantly the Irrigation Pipeline works, which runs from the discharge of the existing Seymour WMF Irrigation Pump Station to the adjacent landowner’s property (David Lawrence) – the party who has agreed to take the water from the Seymour WMF.
- Stage 2 (this AS4300 contract) is the Pump Station works within the Seymour WMF site and involves a new Irrigation Pump Station which pumps water to the adjacent landowner’s property through the Stage 1 pipeline.
- Stage 3 (separate private contract between landowner and ThinkWater Echuca) is the On Farm Irrigation works within the landowner’s property.
TenderHub gathers information continuously from a variety of sources. There may be delays between information being updated at the source and presented here. Always check with the source if you are concerned about currency or accuracy.
Key details
- Source
- Buying for Victoria
Briefings & site visits
No briefings or site visits were listed for this tender.
Awarded suppliers
1Contract awarded
$949,100 awarded to 1 supplier
Girdwood Contracting P/L
$949,100
ABN 70106454308