Goulburn Valley Water
Design and Installation of Bulk Flow Meters 2023-2026
Details
Description
GVW Contractors who tender for work with at total of 100k or more will be required to have a third party certified safety system e.g. AS/NZS 4801:2001
The works of this contract comprise the construction and installation/replacement of DN80-DN500 meter assembly including pits and associated works. The works are situated both within Goulburn Valley Water land and public road reserves. The scope of works is as follows:
• Works site visit
• Supply of Issue for Review and Construction drawings set
• Pit construction and supply & installation of pit covers
• Installation of flowmeters
• Construction of the bypass pipe and necessary connections where required
• Electrical cabling and connections
• Supply of design drawings
• Traffic Management
• VicRoads/Council Approval, where required.
• Supply of equipment as necessary for the completion of the contract works
• Setting out the works
TenderHub gathers information continuously from a variety of sources. There may be delays between information being updated at the source and presented here. Always check with the source if you are concerned about currency or accuracy.
Key details
- Source
- Buying for Victoria
Briefings & site visits
No briefings or site visits were listed for this tender.
Awarded suppliers
1Contract awarded
$450,000 awarded to 1 supplier
Girdwood Contracting P/L
$450,000
ABN 70106454308
See who else bid on this tender
Subscribers see every supplier who bid on this tender, plus its change history and a direct link to the source notice.