WA Public Transport Authority

Goongoongup Bridge Monitoring

AwardedSelect Tender

Details

Awarded
Select tender
This is a select tender. Details and access to the source may be limited to invited suppliers only.

Description

Goongoongup rail bridge is a PTA owned structure spanning over the Swan River, between East Perth and Burswood (Armadale Line). Following construction of the bridge in 1995, significant south-westerly movement of the eastern abutment and approach structure was observed. Design allowance for displacement was exceeded, requiring remedial action. Part of assessing the structure and determining appropriate remediation included an ongoing monitoring survey program, established in August 2002. Between September 2011 and October 2012, an anchoring system was constructed on the eastern abutment and approach structure to reduce displacement, after which, periodic surveys were continued to monitor ongoing movement and determine effectiveness of the anchoring design. The PTA requires the services of an engineering consultant to oversee a surveyor to continue monitoring surveying, then report on results and provide feedback.

Request type

Select Tender

TenderHub gathers information continuously from a variety of sources. There may be delays between information being updated at the source and presented here. Always check with the source if you are concerned about currency or accuracy.

Key details

Source
Tenders WA

Briefings & site visits

No briefings or site visits were listed for this tender.

Awarded suppliers

1

Contract awarded

$242,808 awarded to 1 supplier

  • $242,808

    Level 14, 109 St George's Terrace, Perth WA Australia 6000

    View supplier insights

See who else bid on this tender

Subscribers see every supplier who bid on this tender, plus its change history and a direct link to the source notice.