Description
Background
The Public Transport Operations Migration (PTOM) project forms part of the High-Capacity Signalling (HCS) programme of works to accommodate critical infrastructure and personnel to manage the day-to-day operations of Perth’s expanding public transport network.
The PTA has constructed a five-storey building, Public Transport Operations Control Centre (PTOCC) that will accommodate the following:
- Network Control Centre (NCC)
- Central Monitoring Room (CMR)
- Network and Infrastructure (N&I)
The PTA adopted a staged approach to building and fit-out of the PTOCC with the following stages already completed:
- Stage 1a – PTOCC base building. Completed in December 2023
- Stage 1b – Levels 4 & 5 fit-out. Completed in July 2024
- Stage 2a – Ground Level offices fit-out. Completed in December 2024
- Stage 2b – Level 1 interim NCC fit-out. Completed in March 2024
As part of the ongoing fit-out, the next, and final stage, of the new PTOCC building, the PTA has a requirement for new functions and modifications to existing functions on levels 1 to 3, including but not limited to, new offices, training rooms, comms and electrical distribution, heating and ventilation and fire services.
- Stage 3a – Levels 2 & 3 fit-out. Target completion date June 2026
- Stage 3b – Level 1 NCC fit-out. Target completion date August 2026
- Stage 3c – Level 1 CMR fit-out. Target completion date December 2027
Refer to Book1 and Book4 for comprehensive specifications and additional details
TenderHub gathers information continuously from a variety of sources. There may be delays between information being updated at the source and presented here. Always check with the source if you are concerned about currency or accuracy.
Key details
- Source
- Tenders WA
Briefings & site visits
No briefings or site visits were listed for this tender.
Awarded suppliers
1Contract awarded
$7,244,282 awarded to 1 supplier
OPRA Projects (OPRA Group Australia Pty Ltd)
$7,244,282
Level 2, 26 Queen St, Perth WA Australia 6000
See who else bid on this tender
Subscribers see every supplier who bid on this tender, plus its change history and a direct link to the source notice.