Goulburn Valley Water
Replace Yea Elevated Tank with Booster Pumping System
Details
Description
All GVW Contractors who tender for work with a total of 100k or more will be required to have a third party certified safety system eg AS/NZS 4801:2001
The works of this contract comprise the design, supply, construction, testing and commissioning of a new booster pump station at the Yea Water Treatment Plant to replace the existing elevated tank tower (which is to be decommissioned), including all associated works as shown on the functional design drawings and described in the report and specification. An overview of the scope of works is all associated civil, mechanical and electrical works.
TenderHub gathers information continuously from a variety of sources. There may be delays between information being updated at the source and presented here. Always check with the source if you are concerned about currency or accuracy.
Key details
- Source
- Buying for Victoria
Briefings & site visits
No briefings or site visits were listed for this tender.
Awarded suppliers
1Contract awarded
$515,284 awarded to 1 supplier
Fast Track Fabrication and Design Pty Ltd
$515,284
ABN 52626084213
See who else bid on this tender
Subscribers see every supplier who bid on this tender, plus its change history and a direct link to the source notice.