WA Public Transport Authority
City West Project – Constructability Assessment (By Contractor)
AwardedSelect Tender
Details
Awarded
Select tender
This is a select tender. Details and access to the source may be limited to invited suppliers only.
Description
The City West Project is comprised of two Phases. Phase One is the replacement and raising of the Sutherland Street bridges. Phase Two works are associated with the upgrade to City West Station including a new underpass at Delhi Street. Whilst the phases have been designed so that they can be constructed independently the PTA?s preference is for the phases to be constructed concurrently. PTA has recently completed a concept design (~10%) for this project and is seeking ongoing constructability advice to support the development of mitigation strategies to control key risks to the project. The primary objective is to: Minimise or avoid the closure of the Fremantle line,Minimise the overall construction timeline for the project,Minimise disruption to the adjacent road network and Principal Shared Path (PSP); andIdentify cost efficiencies during material procurement and construction stages. The PTA seeks an initial deliverable of the following: Review the PTA's concept design and provide a concise report with supporting appendices/attachments containing the following for both Phase 1 and 2 as individual projects; anda combined build: Staging plans for construction Construction methodology and techniques to minimise any rail closure timeHigh level construction timeframe (i.e. estimated months for construction) identifying all rail closures needed and length of each.Identification and detailing of any long lead items, estimated duration for procurement and reconstruction activitiesConstruction stage land requirementsHigh level review of foundation/substructure of proposed bridge design including opportunities for the mechanical/chemical stabilisation of earth.Key risks including any potential fatal flaws (with proposed mitigation measures and suggestions for improvement)Suggested additional design information required to inform risk e.g. Geotech, utilities; andA supplier presentation of findings (allow 3 hours). ???????
TenderHub gathers information continuously from a variety of sources. There may be delays between information being updated at the source and presented here. Always check with the source if you are concerned about currency or accuracy.
Key details
- Source
- Tenders WA
Briefings & site visits
No briefings or site visits were listed for this tender.
Awarded suppliers
1Contract awarded
$250,000 awarded to 1 supplier
$250,000
Level 13, 197 St Georges Terrace, Perth WA Australia 6000
View supplier insights
See who else bid on this tender
Subscribers see every supplier who bid on this tender, plus its change history and a direct link to the source notice.