WA Public Transport Authority
Installation of Pits and Pipe Joondalup Line
Details
Description
As part of the PTA Resilience Alignment Project (Joondalup Line), New Traction Overhead System Motorised Isolators are to be installed at the Stirling, Whitfords and Joondalup Blocks. This entails Pit and Pipe civil installation works for the Low Voltage (LV) Electrical and Communications Systems associated with the new Motorised Isolators.
In addition, signal pit and pipe infrastructure is to be installed as part of the Automatic Train Protection (ATP) system. A PTA review of incidents within the rail system and asset environments over recent years has identified that the original Automatic Train Protection (ATP) system installed on the urban rail network in 1992-1993 has become obsolete and is no longer supported by the equipment manufacturer. Therefore it is no longer possible to procure any spare equipment for day to day maintenance and replacement of defective equipment.
TenderHub gathers information continuously from a variety of sources. There may be delays between information being updated at the source and presented here. Always check with the source if you are concerned about currency or accuracy.
Key details
- Source
- Tenders WA
Briefings & site visits
No briefings or site visits were listed for this tender.
Awarded suppliers
1Contract awarded
$1,589,630 awarded to 1 supplier
Underground Services Australia (Underground Services Austrlia Pty. Ltd.)
$1,589,630
16 Kalamunda Road, South Guildford WA Australia 6055
See who else bid on this tender
Subscribers see every supplier who bid on this tender, plus its change history and a direct link to the source notice.