WA Public Transport Authority
Supply, Installation and Commissioning of Signalling Equipment at Whitfords and Joondalup
Details
Description
- Up Joondalup line signal U189 will be relocated towards Whitfords and converted to controlled signal 522 to regulate the Up Trains.
- A new down signal 521 will be provided at 19.205km at Up Line to turn back the Up trains. This signal will have 2 main class routes and 2 shunt class routes reading to signals 527 and 529.
- A new Fixed at Red Up signal 520will be provided at down line to stop and turn the Up train.
- An additional Shunt class route will be provided at existing up signal 524 to route the trains towards new fixed red signal 520 at down line.
- Existing up signal D180 is to be converted to the controlled signal 525
6. A new 3 aspect controlled signal 542 will be provided at 25.638 Km to stop the trains at Up line and turn them onto Down line through existing ground shunt signal 543.
Locations
Categories
Request type
Request for Tender
TenderHub gathers information continuously from a variety of sources. There may be delays between information being updated at the source and presented here. Always check with the source if you are concerned about currency or accuracy.
Key details
- Source
- Tenders WA
Briefings & site visits
No briefings or site visits were listed for this tender.
Awarded suppliers
1Contract awarded
$279,122 awarded to 1 supplier
MGB International
$279,122
Rail Systems Australia, Level 2, 507 Murray Street, Perth WA Australia 3000
See who else bid on this tender
Subscribers see every supplier who bid on this tender, plus its change history and a direct link to the source notice.