QLD Department of Natural Resources, Mines and Energy
The Acquisition of Airborne Magnetic and Radiometric Survey in the Kamilaroi Region
Details
Description
The scope of work covers the supply of data listed below from an airborne magnetic and radiometric survey; the Kamilaroi airborne magnetic and radiometric survey (Figure 1). The proposed boundaries for the survey are attached to this document as a shapefile and the specifications for the survey listed below.
Kamilaroi survey area - Coverage specifications
Line spacing | 100 metres |
Tie line spacing | 1,000 metres |
Line direction | East-West |
Tie line direction | North-South |
Terrain clearance | 60 metre drape |
Approximate line kilometres | Total Survey ~68,000 line kilometres |
Please note: The final extent of the survey area may be altered to ensure that the final contract price does not exceed the available funds.
Survey start proposed when weather conditions in North Queensland are favourable, April-May 2021.
The Completion of Flying Date is 15 weeks after the Commencement of Flying Date.
Categories
Request type
Request for Tender
TenderHub gathers information continuously from a variety of sources. There may be delays between information being updated at the source and presented here. Always check with the source if you are concerned about currency or accuracy.
Key details
- Source
- QLD QTenders
Briefings & site visits
No briefings or site visits were listed for this tender.
Awarded suppliers
1Contract awarded
$604,890 awarded to 1 supplier
$0
Hangar 14, Griffith Airport, Griffith, NSW, Australia, 2680
View supplier insights
See who else bid on this tender
Subscribers see every supplier who bid on this tender, plus its change history and a direct link to the source notice.