Back
Bradfield Development Authority
Reactive Maintenance Provision for the First Building - BDA000721/22-1
AwardedRequest for Quote
Details
Awarded
Description
Description
A project to be undertaken
Description of the goods and services to be provided
The 1st building will have a 12 month maintenance period where any defective works etc. are rectified by the Builder. However there may be instances where work are required that are not covered under the liability period. Examples may be sewer chokes that need to be cleared, overloading of power circuits, repairs to vandalism. For this to occur we need to have a contractor engaged that can carry out a broad range of activities. HIX group are a local contractor that can provide this service, they are on the Whole of Government contract and have advised that they are willing to enter into an agreement for reactive services on an adhoc basis. Additionally as they are on the WofG panel, they may be eligible to tender for the Facilities Maintenance Contract to be put in place at the end of the Builders maintenance liability period
TenderHub gathers information continuously from a variety of sources. There may be delays between information being updated at the source and presented here. Always check with the source if you are concerned about currency or accuracy.
Key details
- Source
- Buy NSW
Briefings & site visits
No briefings or site visits were listed for this tender.
Awarded suppliers
1Contract awarded
$165,000 awarded to 1 supplier
$165,000
ABN 52090733332
Hix Group Pty Ltd 1/10 Production Place Penrith nsw 2750 AU
View supplier insights
See who else bid on this tender
Subscribers see every supplier who bid on this tender, plus its change history and a direct link to the source notice.