QLD Department of Transport and Main Roads
Provision of Pavement Materials and Pre-coated Screenings
Details
Description
Yerra Road Intersection Upgrade
Project duration May 2018 – August 2018
Type 2.1 - 4500 tonnes
Type 2.3 – 3100 tonnes
CBR15 – 250 tonnes (provisional quantity)
10mm Pre-coated Screenings – 125 Tonnes
14mm Pre-coated Screenings – 175 Tonnes
Note: All screenings will be delivered into stockpile. It is envisaged that the majority of the paving material can be delivered directly onto the road, with only a small proportion being stockpiled.
The rate of delivery for Type 2.1 material is envisaged to be in the 750-1000 tonne/day range.
General
All work associated with the Offer shall be performed in accordance with the Department’s Technical Standard
MRS05 (10/16) – Unbound Pavements
MRS22 (10/16) – Cover Aggregate.
MRS50 (10/16) – Specific Quality System Requirements
Locations
Categories
Request type
Request for Tender
TenderHub gathers information continuously from a variety of sources. There may be delays between information being updated at the source and presented here. Always check with the source if you are concerned about currency or accuracy.
Key details
- Source
- QLD QTenders
Briefings & site visits
No briefings or site visits were listed for this tender.
Awarded suppliers
2Contracts awarded
$152,225 awarded to 2 suppliers
BORAL
$0
39 ENTERPRISE STREET, BUNDABERG, QLD, Australia, 4670
Hard Rock Quarries Maryborough
$0
776 Yerra Road, Yerra , QLD, Australia, 4650
See who else bid on this tender
Subscribers see every supplier who bid on this tender, plus its change history and a direct link to the source notice.