VIC South East Water Corporation
Corrosion Monitoring Services
Details
Description
Background
South East Water’s operational water supply network, approximately 620 kilometres of underground water pipelines are constructed from mild steel. The pipelines range from 225 to 2100mm in size with construction dates ranging from 1905 to present. The arrangement of the water mains makes them electrically continuous and, in most instances, are subjected to corrosion due to reaction with the environment, galvanic contact with dissimilar metals or as a result from stray DC current pickup (electrolysis) originating from train and tram traction systems.
To identify pipeline corrosion activity SEW participate in two pipeline monitoring programs.
1.Pipeline Potential Survey
Pipeline potential surveys are conducted at intervals along a pipeline to provide an indication of corrosion resulting either from poor pipe coatings, contact with other pipelines, services or foreign structures, adverse interference effects from other cathodic protection systems or train and tram traction systems. Measured potentials are evaluated against criteria to determines the changes in pipeline potential with respect to the environment. Surveys indicate the effectiveness and requirement for corrosion mitigation syste
2.VEC Area Testing
Under the legislative framework of the Energy Safe Victoria (ESV) the Victorian Electrolysis Committee (VEC) is responsible for the protection of underground structures such as water pipelines from stray current corrosion effects. Area testing involves underground structure owners and traction system operators working in a coordinated test including one or more adjacent traction substations in a nominated test area. Similar to Pipeline Potential Surveys, measurements are conducted at intervals along a pipeline to provide an indication of any adverse corrosion activity.
Contract Objectives
The outcomes that South East Water is looking for are as follows:
- Appoint a Corrosion Monitoring Contractor to perform activities to fulfill SEW’s pipeline potential measurement program.
- Appoint a Corrosion Monitoring Contractor to perform activities to fulfill SEW’s responsibility as a Structure Owner under the direction of the VEC.
Locations
Categories
Request type
Request for Tender
TenderHub gathers information continuously from a variety of sources. There may be delays between information being updated at the source and presented here. Always check with the source if you are concerned about currency or accuracy.
Key details
- Source
- Buying for Victoria
Briefings & site visits
No briefings or site visits were listed for this tender.
Awarded suppliers
1Contract awarded
$700,000 awarded to 1 supplier
PowerPlant
$700,000
ABN 40663488873
See who else bid on this tender
Subscribers see every supplier who bid on this tender, plus its change history and a direct link to the source notice.